Óbudai Egyetem Digitális Archívum
    • magyar
    • English
  • magyar 
    • magyar
    • English
  • Bejelentkezés
Megtekintés 
  •   ÓDA repozitórium kezdőoldal
  • 5. Folyóiratcikkek
  • Acta Polytechnica Hungarica
  • 2. 2024
  • 2.08. 2024 Volume 21, Issue No. 4.
  • Megtekintés
  •   ÓDA repozitórium kezdőoldal
  • 5. Folyóiratcikkek
  • Acta Polytechnica Hungarica
  • 2. 2024
  • 2.08. 2024 Volume 21, Issue No. 4.
  • Megtekintés
JavaScript is disabled for your browser. Some features of this site may not work without it.

Pre-Calculation of the Implementation of a Warehouse Management System, for a Specific Company

Thumbnail
Megtekintés/Megnyitás
Zsoter_Vegh_144.pdf (349.9KB)
Metaadat
Teljes megjelenítés
Link a dokumentumra való hivatkozáshoz:
http://hdl.handle.net/20.500.14044/33471
Gyűjtemény
  • 2.08. 2024 Volume 21, Issue No. 4. [16]
Absztrakt
Companies constantly seek solutions for complex technical and economic tasks and this is especially difficult for small and medium-sized enterprises. For this, we provide an example in the barcode processing area. By looking at several versions at one company, we will show how much it costs to introduce a barcode-based warehouse management system. Our specific task was to pre-calculate the expansion of the existing ERP (Enterprise Resource Planning) system with a barcode warehouse management system. To this end, we have looked at good practices in recent years, as part of various field surveys, with several companies, across Hungary. The cost of building a barcode warehouse management system is HUF 25837559. It can be implemented on its own or with support. The barcode warehouse management system can be extended to all employees, but a version that is only extended to office employees, can also be analyzed. Accordingly, four cases were examined. In one of these cases, we set-up the theory, that in the structure of the barcode system, we extend the project management module in the expansion of the ERP system only among office employees, and thus, the investment pays off in 5 years, from existing resources. The NPV is HUF 13220000, the IRR is 43.24%, the profitability index is 1.71, DPB is 2.92 years. The logic of the calculations can be used in many other areas.
Cím és alcím
Pre-Calculation of the Implementation of a Warehouse Management System, for a Specific Company
Szerző
Zsótér, Brigitta
Végh, Katalin
Megjelenés ideje
2024
Hozzáférés szintje
Open access
ISSN, e-ISSN
1785-8860
Nyelv
en
Terjedelem
14 p.
Tárgyszó
warehouse management system, ERP, barcode, pre-calculation, NPV, DPB, IRR
Változat
Kiadói változat
Egyéb azonosítók
DOI: 10.12700/APH.21.4.2024.4.12
A cikket/könyvrészletet tartalmazó dokumentum címe
Acta Polytechnica Hungarica
A forrás folyóirat éve
2024
A forrás folyóirat évfolyama
21. évf.
A forrás folyóirat száma
4. sz.
Műfaj
Tudományos cikk
Tudományterület
Műszaki tudományok - multidiszciplináris műszaki tudományok
Egyetem
Óbudai Egyetem

DSpace software copyright © 2002-2016  DuraSpace
Kapcsolat | Visszajelzés
Theme by 
Atmire NV
 

 

Böngészés

A teljes ÓDA-banKategóriák és gyűjteményekMegjelenés dátumaSzerzőCímTárgyszóA gyűjteménybenMegjelenés dátumaSzerzőCímTárgyszó

Személyes felhasználói fiók

BejelentkezésRegisztráció

DSpace software copyright © 2002-2016  DuraSpace
Kapcsolat | Visszajelzés
Theme by 
Atmire NV