Rövidített megjelenítés

Maghrebi, Mojtaba
Waller, Travis
Sammut, Claude
2025-06-03T07:12:04Z
2025-06-03T07:12:04Z
2013
2064-2520hu_HU
http://hdl.handle.net/20.500.14044/29764
One of the major causes of delays in construction sites belongs to the delays in delivering materials. This paper introduces the integrated Building Information Modelling (BIM) model combined with a supply chain and a controlling system, along with its efficiency for alleviating the negative effects of delays caused by a lack of materials on construction sites. So, firstly the concept of feed-forward control is discussed as a prevention feature in a monitoring system. Then the integrating BIM model with a supply chain is introduced. Finally this case study has shown how the enhanced BIM model can incorporate the feed-forward control in order to decrease the risks of delays caused by a lack of materials in construction. Moreover, this case study might be used as a decision support system for managers to prevent a construction site from future delays by providing valuable information about the required materials in advanced.hu_HU
dc.formatPDFhu_HU
enhu_HU
ARCHIVE 2013 December Integrated Building Information Modelling (BIM) With Supply Chain and Feed-Forward Controlhu_HU
Open accesshu_HU
Óbudai Egyetemhu_HU
Budapesthu_HU
Ybl Miklós Építéstudományi Karhu_HU
Óbudai Egyetemhu_HU
Műszaki tudományok - multidiszciplináris műszaki tudományokhu_HU
building information modellinghu_HU
supply chainhu_HU
feed-forward controlhu_HU
Tudományos cikkhu_HU
YBL Journal of Built Environmenthu_HU
local.tempfieldCollectionsFolyóiratcikkekhu_HU
Kiadói változathu_HU
10 p.hu_HU
2. sz.hu_HU
1. évf.hu_HU
2013hu_HU
Óbudai Egyetemhu_HU


A dokumentumhoz tartozó fájlok

Thumbnail

A dokumentum a következő gyűjtemény(ek)ben található meg

Rövidített megjelenítés