ARCHIVE 2013 December Integrated Building Information Modelling (BIM) With Supply Chain and Feed-Forward Control
Megtekintés/ Megnyitás
Metaadat
Teljes megjelenítés
Link a dokumentumra való hivatkozáshoz:
Gyűjtemény
Absztrakt
One of the major causes of delays in construction sites belongs to the delays in delivering materials. This paper introduces the integrated Building Information Modelling (BIM) model combined with a supply chain and a controlling system, along with its efficiency for alleviating the negative effects of delays caused by a lack of materials on construction sites. So, firstly the concept of feed-forward control is discussed as a prevention feature in a monitoring system. Then the integrating BIM model
with a supply chain is introduced. Finally this case study has shown how the enhanced BIM model can incorporate the feed-forward control in order to decrease the risks of delays caused by a lack of materials in construction. Moreover, this case study might be used as a decision support system for managers to prevent a construction site from future delays by providing valuable information about the required materials in advanced.
- Cím és alcím
- ARCHIVE 2013 December Integrated Building Information Modelling (BIM) With Supply Chain and Feed-Forward Control
- Szerző
- Maghrebi, Mojtaba
- Waller, Travis
- Sammut, Claude
- Megjelenés ideje
- 2013
- Hozzáférés szintje
- Open access
- ISSN, e-ISSN
- 2064-2520
- Nyelv
- en
- Terjedelem
- 10 p.
- Tárgyszó
- building information modelling, supply chain, feed-forward control
- Változat
- Kiadói változat
- A cikket/könyvrészletet tartalmazó dokumentum címe
- YBL Journal of Built Environment
- A forrás folyóirat éve
- 2013
- A forrás folyóirat évfolyama
- 1. évf.
- A forrás folyóirat száma
- 2. sz.
- Műfaj
- Tudományos cikk
- Tudományterület
- Műszaki tudományok - multidiszciplináris műszaki tudományok
- Egyetem
- Óbudai Egyetem
- Kar
- Ybl Miklós Építéstudományi Kar