Óbudai Egyetem Digitális Archívum
    • magyar
    • English
  • magyar 
    • magyar
    • English
  • Bejelentkezés
Megtekintés 
  •   ÓDA repozitórium kezdőoldal
  • 5. Folyóiratcikkek
  • Acta Polytechnica Hungarica
  • 2. 2024
  • 2.11. 2024 Volume 21, Issue No. 1.
  • Megtekintés
  •   ÓDA repozitórium kezdőoldal
  • 5. Folyóiratcikkek
  • Acta Polytechnica Hungarica
  • 2. 2024
  • 2.11. 2024 Volume 21, Issue No. 1.
  • Megtekintés
JavaScript is disabled for your browser. Some features of this site may not work without it.

Impact Assessment of Railway Bridge Construction Schedule, based on 3D Geotechnical Finite Element Modeling

Thumbnail
Megtekintés/Megnyitás
Koch_Ray_141.pdf (727.9KB)
Metaadat
Teljes megjelenítés
Link a dokumentumra való hivatkozáshoz:
http://hdl.handle.net/20.500.14044/33764
Gyűjtemény
  • 2.11. 2024 Volume 21, Issue No. 1. [15]
Absztrakt
The increasing demand for high-speed railways has risen, to solve the "age-old" problem of bridge abutments, the step between the backfill and the bridge deck. Examples prove that inadequate technical solutions can generate damage that may require long-term speed restrictions or lead to short maintenance cycles, significantly increasing the total cost of ownership. The problems associated with the transition zones require complex analysis. The complex interaction of structural elements with different stiffnesses and different dynamic behavior varies over time due to the time-dependent behavior of the soil, and in addition, a bridge deck and its connecting elements can be constructed in several sequences. This study investigated a typical single-span railway bridge and its soil environment using PLAXIS 3D geotechnical finite element software. Different constitutive soil models were used to approximate the behavior of the bridge and the connecting elements. To model the soil behavior, the HS-small constitutive model was implemented. Loads of the structure are transferred onto the subsoil by 60 cm diameter piles modeled as embedded piles. Six different construction schedules were analyzed using time-domain analyses. The importance of high-speed railways was highlighted, and a 250 km/h train speed was applied, using dynamic analysis. The study focuses on the effect of different construction schedules on settlement, consolidation time, the behavior of the transition, and the substructure movements. The results of this study show that geotechnical approaches by themselves are not enough to solve the problem of the transition zone, highlighting the collaboration of geotechnical, structural and railway engineers.
Cím és alcím
Impact Assessment of Railway Bridge Construction Schedule, based on 3D Geotechnical Finite Element Modeling
Szerző
Koch, Edina
Ray, Richard P.
Megjelenés ideje
2024
Hozzáférés szintje
Open access
ISSN, e-ISSN
1785-8860
Nyelv
en
Terjedelem
19 p.
Tárgyszó
numerical modeling, railway bridge, time effect, transition zone
Változat
Kiadói változat
Egyéb azonosítók
DOI: 10.12700/APH.21.1.2024.1.12
A cikket/könyvrészletet tartalmazó dokumentum címe
Acta Polytechnica Hungarica
A forrás folyóirat éve
2024
A forrás folyóirat évfolyama
21. évf.
A forrás folyóirat száma
1. sz.
Műfaj
Tudományos cikk
Tudományterület
Műszaki tudományok - közlekedés- és járműtudományok
Egyetem
Óbudai Egyetem

DSpace software copyright © 2002-2016  DuraSpace
Kapcsolat | Visszajelzés
Theme by 
Atmire NV
 

 

Böngészés

A teljes ÓDA-banKategóriák és gyűjteményekMegjelenés dátumaSzerzőCímTárgyszóA gyűjteménybenMegjelenés dátumaSzerzőCímTárgyszó

Személyes felhasználói fiók

BejelentkezésRegisztráció

DSpace software copyright © 2002-2016  DuraSpace
Kapcsolat | Visszajelzés
Theme by 
Atmire NV