The study assessed allocation, criteria and allotment effectiveness of performance risks in Build- Operate-Transfer (BOT) transportation infrastructure in Nigeria using Lagos Infrastructure Project (LIP) as a case study. LIP is the only BOT-procured tolled road that has attained ‘operate’ stage of BOT cycle in Nigeria. It revealed that more operating risks were actually allocated to the concessionaire than the grantor and most of the risks were preferred retained by the allottee. Significant fraction of the risks was effectively allocated between the concessionaire and grantor except those that involve close interface between participants. While grantor rated nine risks high and seven risks very high; the concessionaire assessed nine risks to be high and five risks to be very high; the grantor rated the effectiveness level to be seventy three per cent and the concessionaire assessed it to be sixty four per cent. The study recommended that the evolving knowledge from Lagos Infrastructure Project (LIP) should be documented to guide future BOT transactions in Nigeria.hu_HU
dc.formatPDFhu_HU
enhu_HU
Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Projecthu_HU
Open accesshu_HU
Óbudai Egyetemhu_HU
Budapesthu_HU
Ybl Miklós Építéstudományi Karhu_HU
Óbudai Egyetemhu_HU
Műszaki tudományok - építészmérnöki tudományokhu_HU
concessionhu_HU
infrastructurehu_HU
nigeriahu_HU
performancehu_HU
riskhu_HU
transportationhu_HU
Tudományos cikkhu_HU
YBL Journal of Built Environmenthu_HU
local.tempfieldCollectionsFolyóiratcikkekhu_HU
Kiadói változathu_HU
15 p.hu_HU
1. sz.hu_HU
5. évf.hu_HU
2017hu_HU
Óbudai Egyetemhu_HU


A dokumentumhoz tartozó fájlok

Thumbnail

A dokumentum a következő gyűjtemény(ek)ben található meg

Rövidített megjelenítés